Because we are installing in-floor radiant heat, so the crew came in and screwed down plywood sleepers for the hardwood to be nailed to in most of the house. Only the entry, mudroom, laundry and baths will have brick or tile, so no sleepers there.    Then the maze of radiant heat tubing was installed followed by gypcrete.  




The Renaissance Rumford fireplace has been installed and gypcrete poured.

Sheetrock began at the end of June.  It seemed like a big puzzle.  They went through and put up all the full size sheets they could and then went back and filled in the missing pieces.